Loveland continued its expansions during the 1990’s. In 1990, Yan was contracted to install Loveland’s first fixed-grip quad. The lift serves intermediate and expert bowl terrain to the right of Chair 4. Due to increased skier numbers, in 1995, Loveland decided to enlarge the Basin lodge to its current size. This drastically increased the number of people the building could accommodate. The following year, chair 3 was replaced by a Poma quad chair, doubling the lift capacity at the Valley.
The sun made us lazy, and after following Brian as he made his way upstream I found a wider expanse of sand and gravel, promptly plopping down on a pair of flip flops I had brought in my backpack as a make-shift seat. After identifying the northern harrier hawk over my head, and the savannas sparrows and red-winged blackbirds perched precariously on reeds across the water, I took out my knitting project. I didn’t have to worry about losing Brian; in the valley I could see for miles in both directions.
×